Trench and Arch Construction
Byrd hill over entry drifting
Byrd Station Entrance D-8
  Buildings 50 feet under glacier in arched tunnel.jpg - Insulated prefabricated buildings were flown in and constructed in deep trenches at New Byrd Station in 1962.  Metal arches were placed overhead and snow was back-filled level with the surface to prevent drifting. Temperatures in the tunnels was about 15° F, warmed somewhat by heat escaping from the heated buildings. Most supplies were stored frozen in the tunnels.  
Walkway past buildings in tunnels
Walkway to connecting tunnel
Byrd walkway by buildings in tunnels
Byrd deep ice core drill
EMC Officer in Charge Byrd Station

Insulated prefabricated buildings were flown in and constructed in deep trenches at New Byrd Station in 1962. Metal arches were placed overhead and snow was back-filled level with the surface to prevent drifting. Temperatures in the tunnels was about 15° F, warmed somewhat by heat escaping from the heated buildings. Most supplies were stored frozen in the tunnels. Download