Up RETURN TO PHOTO ALBUM HOME DIRECTORY » ANTARCTIC Prev Next Slideshow

 Previous image  Next image  Index page
Byrd hill over entry drifting
Byrd Station Entrance D-8
Buildings 50 feet under glacier in arched tunnel
Walkway past buildings in tunnels
Walkway to connecting tunnel
  Byrd walkway by buildings in tunnels.jpg - The tunnel walls are slowly moving in and collapsing. Ice under pressure flows slowly, like a liquid. This process will eventully destroy the Station.  
Byrd deep ice core drill
EMC Officer in Charge Byrd Station
Byrd OinC Office for EMC
Byrd Station main tunnel
D-8 Cat in vehicle tunnel and entrance

The tunnel walls are slowly moving in and collapsing. Ice under pressure flows slowly, like a liquid. This process will eventully destroy the Station. Download
<-/-> Previous image / Next image -- Backspace Index page -- Home First Image -- End Last Image -- Space Start/Stop slideshow
Total images: 101
OPERATON DEEPFREEZE, ANTARCTICA 1966-67