Up RETURN TO PHOTO ALBUM HOME DIRECTORY » ANTARCTIC Prev Next Slideshow

 Previous image  Next image  Index page
Byrd Station sick bay
Tunnel collapse crushing buildings
Entrance tunnel collapsing -  trash sled
First sunrise in 3 months
Sunrise after 3 months darkness
  Keeping the aircraft runway clear.jpg - A D-8 Cat smoothes the drifted ice runway in preparation for the first inbound flight after 8 months of isolation. The last flight departed on February 22, 1967, and next arrived on October 20th. A long time between flights.  
Abandoned 1955 Byrd Station
Abandoned 1955 Byrd Station 2
Abandoned 1955 Byrd Station 3
Abandoned 1955 Byrd Station collapse
Abandoned 1955 Byrd  collapse 2

A D-8 Cat smoothes the drifted ice runway in preparation for the first inbound flight after 8 months of isolation. The last flight departed on February 22, 1967, and next arrived on October 20th. A long time between flights. Download
<-/-> Previous image / Next image -- Backspace Index page -- Home First Image -- End Last Image -- Space Start/Stop slideshow
Total images: 101
OPERATON DEEPFREEZE, ANTARCTICA 1966-67