Byrd entry-exit tunnel
Byrd escape hatch ladder to surface
Byrd escape hatch on surface
Byrd Station Plot Map
Byrd Station Plot Map  Numbers
  Trench and Arch Construction .jpg - After trenching into the glacier, prefabricated buildings were constructed and metal arches placed overhead.  Snow and crushed ice was back filled level with the surface to minimize snow drifting, which will eventually crush the station. This photo was taken at South Pole Station. The newer Byrd Station was trenched deeper and the arches were mounted part way up the trench walls, as shown in subsequent photos.  
Byrd hill over entry drifting
Byrd Station Entrance D-8
Buildings 50 feet under glacier in arched tunnel
Walkway past buildings in tunnels
Walkway to connecting tunnel

After trenching into the glacier, prefabricated buildings were constructed and metal arches placed overhead. Snow and crushed ice was back filled level with the surface to minimize snow drifting, which will eventually crush the station. This photo was taken at South Pole Station. The newer Byrd Station was trenched deeper and the arches were mounted part way up the trench walls, as shown in subsequent photos. Download