Up RETURN TO PHOTO ALBUM HOME DIRECTORY » ANTARCTIC Prev Next Slideshow

 Previous image  Next image  Index page
Byrd Station Plot Map  Numbers
Trench and Arch Construction
Byrd hill over entry drifting
Byrd Station Entrance D-8
Buildings 50 feet under glacier in arched tunnel
  Walkway past buildings in tunnels.jpg - Wooden walkways ran past the buildings. Metal arches and fuel lines used for building furnaces run above. Water lines run below, insulated and kept from freezing with electric heat tapes.  
Walkway to connecting tunnel
Byrd walkway by buildings in tunnels
Byrd deep ice core drill
EMC Officer in Charge Byrd Station
Byrd OinC Office for EMC

Wooden walkways ran past the buildings. Metal arches and fuel lines used for building furnaces run above. Water lines run below, insulated and kept from freezing with electric heat tapes. Download
<-/-> Previous image / Next image -- Backspace Index page -- Home First Image -- End Last Image -- Space Start/Stop slideshow
Total images: 101
OPERATON DEEPFREEZE, ANTARCTICA 1966-67